Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2026 | BULD - Electrical Clearance | Re-inspection required | Unable to contact contractor | |
| 08/10/2026 | BULD - Electrical Clearance | Canceled | 08/10/2026 Canceled by contractor. |
|
| 08/14/2026 | BULD - Electrical Clearance | Re-inspection required | 08/14/2026 Current field configuration has a 40A PV breaker inside a sub panel. Plans call for a 60A meter socket adapter at the main service entrance. Please revise plans to show PV breaker at sub panel and size according to approved plans and SolarAPP checklist. |