Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
12/31/2025
Applicant:
Bradley Jones
Description:
ADU

Permit Reviews

Permit Number - TC-RES-1225-06225
Permit Status: Inspections complete
Permit Description: ADU
Start Date Submittal Complete Date Status  
01/07/2026 RESIDENTIAL ADU v.1 01/20/2026 REQUIRES RESUBMIT Review Details
02/20/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/24/2026 APPROVED Review Details
01/26/2026 RESIDENTIAL ADU v.2 01/28/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-1225-06225
Permit Status: Inspections complete
Permit Description: ADU
Date Description Comments
01/12/2026 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
01/07/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
01/12/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1225-06225
Permite Description: ADU
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/02/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 03/02/2026
Loose anchor bolt nuts throughout marked in red, add roof nails to loose roof panels at two locations as marked in red, add shot pins at marked locations on interior wall.
03/02/2026 COT - RSBU - Roof Nailing N/A Re-inspection required 03/02/2026
Loose anchor bolt nuts throughout marked in red, add roof nails to loose roof panels at two locations as marked in red, add shot pins at marked locations on interior wall.
04/07/2026 COT - RSEL - Electrical Underground N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1225-06225
Permit Description: ADU
Total Completed Inspections - 16
Date Description Inspector Results Comments
02/18/2026 COT - RSPL - Rough Soil Passed 2.18.26
Approved
02/18/2026 COT - RSPL - Yard Water Line Passed 2.18.26
Approved
02/23/2026 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 2/23/26
02/23/2026 COT - RSBU - Preslab Passed Passed 2/23/26
03/02/2026 BULD - Electrical Clearance Passed 03/02/2026
Verbal clearance to TEP INCR for 200A MPU at 11am.
03/03/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 03/03/2026
Issued addressed from prior inspection.
03/03/2026 COT - RSBU - Roof Nailing Passed 03/03/2026
Corrections made from prior inspection.
03/10/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 03/10/2026
Corrections made to prior inspection.
04/07/2026 COT - RSPL - Gas Pressure Test Passed
04/10/2026 COT - RSPL - Sewer Passed 04/10/2026
Approved. Holding under test with green tracer wire in trench to private septic system. Okay to backfill with shading material.
04/16/2026 COT - BULD - SWG Clearance Passed 04/16/2026
Approved clearance Southwest Gas.
04/22/2026 RSBU - Building Final Passed
04/22/2026 COT - RSEL - Electrical Final Passed
04/22/2026 COT - RSEL - Outdoor Lighting Passed
04/22/2026 COT - RSME - Mechanical Final Passed 04/22/2026
Verified bolted down AC condenser units to pad outside and secured range to anti-tip device.
04/22/2026 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
LASSISE-LAYOUT_V1.PDF DOCUMENTS VIEW
R92664028.LASSISE_RESIDENCE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-SET PLANS - ADU LASSISE_V2_V2.PDF DOCUMENTS VIEW