Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 3/6/2026 Add all nails to holes in FHA plates due to large top plate notching in bedroom, route VTR plastic pipe that is underneath subpanel per IRC 2018 E3405.1 - which requires foreign equipment to electrical system not be placed underneath from floor to height of 6". Electrical plan calls for 16 circuits but 15 circuits landed. Gas line is good and holding under test. |
|
| 03/10/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 03/10/2026 Corrections made to prior inspection. |