Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9579 E HARKES DR
Address NEW:
9579 E HARKES DR
Apply Date:
12/18/2024
Applicant:
Natalia Soto
Description:
9.085KW Roof Mounted PV Installation 23 Modules

Permit Reviews

Permit Number - TC-RES-1224-07361
Permit Status: Complete
Permit Description: 9.085KW Roof Mounted PV Installation 23 Modules
Start Date Submittal Complete Date Status  
04/30/2025 RESIDENTIAL SOLAR REVISION v.1 06/17/2025 APPROVED Review Details
12/19/2024 RESIDENTIAL SOLAR v.1 01/21/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1224-07361
Permite Description: 9.085KW Roof Mounted PV Installation 23 Modules
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/26/2025 RSBU - Building Final N/A Partial Pass 6.26.26
PV system is installed according to plan. Proper sized conductors verified. Bonding and grounding verified. White neutrals verified. Proper amperage and breaker sizes verified. All labels verified EXCEPT equipment placard at main panel. PARTIAL PASS PENDING PHOTO PF PLACARD.
06/26/2025 COT - RSOL - Electrical Final Solar Project N/A Partial Pass 6.26.26
PV system is installed according to plan. Proper sized conductors verified. Bonding and grounding verified. White neutrals verified. Proper amperage and breaker sizes verified. All labels verified EXCEPT equipment placard at main panel. PARTIAL PASS PENDING PHOTO PF PLACARD.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1224-07361
Permit Description: 9.085KW Roof Mounted PV Installation 23 Modules
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/22/2025 RSBU - Building Final Passed 7/22/25 corrections made CLEARANCE DGC
07/22/2025 COT - RSOL - Electrical Final Solar Project Passed 7/22/25 corrections made CLEARANCE DGC
07/22/2025 BULD - Electrical Clearance Passed 7/22/25 corrections made CLEARANCE DGC

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MIRADOR POINT LOT 69 PLANS_V1.PDF DOCUMENTS VIEW
LOT 69 ESCALERA MIRADOR REPONSE LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MIRADOR POINT LOT 69 FULL PLANS_V1.PDF DOCUMENTS VIEW