Inspection History Details
Inspection Status: Partial Pass
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2025 | RSBU - Building Final | Partial Pass | 6.26.26 PV system is installed according to plan. Proper sized conductors verified. Bonding and grounding verified. White neutrals verified. Proper amperage and breaker sizes verified. All labels verified EXCEPT equipment placard at main panel. PARTIAL PASS PENDING PHOTO PF PLACARD. |
|
| 07/22/2025 | RSBU - Building Final | Passed | 7/22/25 corrections made CLEARANCE DGC |