Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address NEW:
101 N BELLA VISTA DR
Apply Date:
12/18/2023
Applicant:
Robert Roca
Description:
Second Sleeping Quarters and Garage

Permit Reviews

Permit Number - TC-RES-1223-10151
Permit Status: Inspections complete
Permit Description: Second Sleeping Quarters and Garage
Start Date Submittal Complete Date Status  
02/27/2024 RESIDENTIAL NEW DWELLING v.2 03/28/2024 APPROVED Review Details
12/19/2023 RESIDENTIAL NEW DWELLING v.1 01/11/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-1223-10151
Permit Status: Inspections complete
Permit Description: Second Sleeping Quarters and Garage
Total Outstanding Activity Conditions - 1
Date Name
03/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-RES-1223-10151
Permit Status: Inspections complete
Permit Description: Second Sleeping Quarters and Garage
Date Description Comments
03/28/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1223-10151
Permite Description: Second Sleeping Quarters and Garage
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/01/2024 COT - RSBU - Preslab N/A Partial Pass 11/1/24: stem wall reinforcement per plan at sleeping quarters. Pending garage
10/07/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Partial Pass 10/7/24: Footings at perimeter walls per plan ok to proceed with concrete placement.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1223-10151
Permit Description: Second Sleeping Quarters and Garage
Total Completed Inspections - 14
Date Description Inspector Results Comments
02/26/2025 COT - RSBU - Preslab Passed 2/26/25 corrections made ok to pour concrete
05/20/2025 COT - RSBU - Roof Nailing Passed
05/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/29/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed OK to insulate and sheet rock throughout.
07/09/2026 RSBU - Building Final Passed
07/09/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 07/09/2026
Passed prior inspection.
07/09/2026 COT - RSPL - Rough Soil Passed 07/09/2026
Passed prior inspection.
07/09/2026 COT - RSPL - Plumbing Final Passed
07/09/2026 COT - RSPL - Yard Water Line Passed 07/09/2026
Verified trench and PEX, holding under test.
07/09/2026 COT - RSME - Mechanical Final Passed
07/09/2026 COT - RSEL - Electrical Underground Passed
07/09/2026 COT - RSEL - Electrical Final Passed 07/09/2026
Covered junction in crawl space.
07/09/2026 COT - RSBU - Stem Wall/Retaining Wall Passed 07/09/2026
Passed prior inspection.
07/09/2026 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
OBA 10151_V1.PDF DOCUMENTS VIEW
2_STRUCT_CALCS_1_V1.PDF DOCUMENTS VIEW
2_STRUCT_CALCS_2_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN_SET_V2.PDF DOCUMENTS VIEW