Permit: TC-RES-1223-10151
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
101 N BELLA VISTA DR
Address NEW:
101 N BELLA VISTA DR
Apply Date:
12/18/2023
Applicant:
Robert Roca
Description:
Second Sleeping Quarters and Garage
Permit Reviews
Permit Number - TC-RES-1223-10151
Permit Status: Inspections complete
Permit Description: Second Sleeping Quarters and Garage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2024 | RESIDENTIAL NEW DWELLING v.2 | 03/28/2024 | APPROVED |
| 12/19/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/11/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-1223-10151
Permit Status: Inspections complete
Permit Description: Second Sleeping Quarters and Garage
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-RES-1223-10151
Permit Status: Inspections complete
Permit Description: Second Sleeping Quarters and Garage
| Date | Description | Comments |
|---|---|---|
| 03/28/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1223-10151
Permite Description: Second Sleeping Quarters and Garage
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2024 | COT - RSBU - Preslab | N/A | Partial Pass | 11/1/24: stem wall reinforcement per plan at sleeping quarters. Pending garage |
| 10/07/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 10/7/24: Footings at perimeter walls per plan ok to proceed with concrete placement. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1223-10151
Permit Description: Second Sleeping Quarters and Garage
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2025 | COT - RSBU - Preslab | Passed | 2/26/25 corrections made ok to pour concrete | |
| 05/20/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 05/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | OK to insulate and sheet rock throughout. | |
| 07/09/2026 | RSBU - Building Final | Passed | ||
| 07/09/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 07/09/2026 Passed prior inspection. |
|
| 07/09/2026 | COT - RSPL - Rough Soil | Passed | 07/09/2026 Passed prior inspection. |
|
| 07/09/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/09/2026 | COT - RSPL - Yard Water Line | Passed | 07/09/2026 Verified trench and PEX, holding under test. |
|
| 07/09/2026 | COT - RSME - Mechanical Final | Passed | ||
| 07/09/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 07/09/2026 | COT - RSEL - Electrical Final | Passed | 07/09/2026 Covered junction in crawl space. |
|
| 07/09/2026 | COT - RSBU - Stem Wall/Retaining Wall | Passed | 07/09/2026 Passed prior inspection. |
|
| 07/09/2026 | COT - RSEL - Outdoor Lighting | Passed |