Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5143 E ADAMS ST
Address NEW:
5143 E ADAMS ST
Apply Date:
12/06/2022
Applicant:
Mary Hayn
Description:
28' x 14' 392 SF NEW POOL

Permit Reviews

Permit Number - TC-RES-1222-01320
Permit Status: Complete
Permit Description: 28' x 14' 392 SF NEW POOL
Start Date Submittal Complete Date Status  
03/05/2023 RESIDENTIAL NEW DWELLING v.2 03/07/2023 REQUIRES RESUBMIT Review Details
01/30/2023 RESIDENTIAL NEW DWELLING v.1 03/01/2023 REQUIRES RESUBMIT Review Details
03/13/2023 RESIDENTIAL NEW DWELLING v.3 04/07/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-1222-01320
Permit Status: Complete
Permit Description: 28' x 14' 392 SF NEW POOL
Date Description Comments
04/07/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1222-01320
Permite Description: 28' x 14' 392 SF NEW POOL
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/24/2023 RSEL - Electrical Progress N/A Partial Pass Conduit for pool light is installed in trench running to pool pump location.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1222-01320
Permit Description: 28' x 14' 392 SF NEW POOL
Total Completed Inspections - 10
Date Description Inspector Results Comments
05/24/2023 Pool/Spa - Bonding Grip Passed Bonding wire is installed all the way around pool and connected to the rebar as a ufer ground and ran to the pool pump location.
05/24/2023 Pool/Spa - Plumbing Passed underground plumbing is complete for pool and pool pump. okay to backfill trench.
05/24/2023 Pool/Spa - Pre-Gunite Passed All rebar reinforcement is installed, edge forms are in place, rebar dobies are in place holding reinforcement off the ground. Okay to apply gunite.
02/16/2024 Pool/Spa - Gas Passed Gas line is installed in trench with yellow tracer wire, gas line is under an air pressure test and holding 20# of air. Okay to connect to gas meter and backfill trench.
02/16/2024 COT - BULD - SWG Clearance Passed Gas line is installed in trench with yellow tracer wire, gas line is under an air pressure test and holding 20# of air. Okay to connect to gas meter and backfill trench.
01/31/2025 Pool/Spa - Electric Passed
01/23/2025 Pool/Spa - Final/Barrier Passed
01/23/2025 RSBU - Building Final Passed
01/23/2025 RSEL - Electrical Progress Passed
01/23/2025 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ENG LTR_V1.PDF DOCUMENTS VIEW
GAS TEMP_V1.PDF DOCUMENTS VIEW
STRC PLAN_V3.PDF DOCUMENTS VIEW
HTR CSHT_V1.PDF DOCUMENTS VIEW