Permit: TC-RES-1125-05664
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
7701 S FALSTER AV
Address NEW:
7701 S FALSTER AV
Apply Date:
11/24/2025
Applicant:
brian dunn
Description:
Repipe hot and cold water lines through the interior of the home.
Permit Reviews
Permit Number - TC-RES-1125-05664
Permit Status: Inspections
Permit Description: Repipe hot and cold water lines through the interior of the home.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/24/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 11/24/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1125-05664
Permit Status: Inspections
Permit Description: Repipe hot and cold water lines through the interior of the home.
| Date | Description | Comments |
|---|---|---|
| 11/24/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1125-05664
Permite Description: Repipe hot and cold water lines through the interior of the home.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 11-26-25: 18" of copper is required at main water and at water heater before transitioning to pex, add R3 insulation/wrap using 10 mil tape to hot leg of water heater & at main together with vacuum breakers and at each hose-bib, install hammer arrestor on dishwasher line, and add firefoam at all penetrations at top plates. Reschedule inspection when ready. |
| 11/26/2025 | RSPL - Plumbing Progress | N/A | Re-inspection required | 11-26-25: 18" of copper is required at main water and at water heater before transitioning to pex, add R3 insulation/wrap using 10 mil tape to hot leg of water heater & at main together with vacuum breakers and at each hose-bib, install hammer arrestor on dishwasher line, and add firefoam at all penetrations at top plates. Reschedule inspection when ready. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1125-05664
Permit Description: Repipe hot and cold water lines through the interior of the home.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2025 | COT - RSPL - Plumbing Final | Passed | 12.1.25 Corrections made per previous notes Approved |
|
| 12/01/2025 | RSBU - Building Final | Passed | 12.1.25 Corrections made per previous notes Approved |
|
| 12/15/2025 | RSPL - Plumbing Progress | Passed | 12/15/2025 Passed final on 12/01/2025, approved per AC. |