Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSPL - Plumbing Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2025 | RSPL - Plumbing Progress | Re-inspection required | 11-26-25: 18" of copper is required at main water and at water heater before transitioning to pex, add R3 insulation/wrap using 10 mil tape to hot leg of water heater & at main together with vacuum breakers and at each hose-bib, install hammer arrestor on dishwasher line, and add firefoam at all penetrations at top plates. Reschedule inspection when ready. | |
| 12/15/2025 | RSPL - Plumbing Progress | Passed | 12/15/2025 Passed final on 12/01/2025, approved per AC. |