Permit: TC-RES-1125-05602
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
2202 E DRACHMAN ST
Address NEW:
2202 E DRACHMAN ST
Apply Date:
11/19/2025
Applicant:
Jill Baker
Description:
masonry wall at front of property
Permit Reviews
Permit Number - TC-RES-1125-05602
Permit Status: Inspections complete
Permit Description: masonry wall at front of property
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/25/2025 | RESIDENTIAL FENCE/WALL v.1 | 11/28/2025 | REQUIRES RESUBMIT |
| 01/21/2026 | RESIDENTIAL FENCE/WALL v.3 | 01/28/2026 | REQUIRES RESUBMIT |
| 07/10/2026 | ADMINISTRATIVE v.2 | N/A | APPROVED |
| 03/03/2026 | ADMINISTRATIVE v.1 | 03/03/2026 | REQUIRES RESUBMIT |
| 02/26/2026 | RESIDENTIAL FENCE/WALL v.4 | 03/03/2026 | APPROVED |
| 12/16/2025 | RESIDENTIAL FENCE/WALL v.2 | 01/02/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-1125-05602
Permit Status: Inspections complete
Permit Description: masonry wall at front of property
| Date | Description | Comments |
|---|---|---|
| 11/25/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1125-05602
Permit Description: masonry wall at front of property
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2026 | SITE - Zoning Final | Passed | Wall is complete in accordance with approved plans. | |
| 07/31/2026 | ENGR Engineering Final | Passed | Wall is complete in accordance with approved plans. |