Permit: TC-RES-1125-05332
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
2730 N NORRIS AV
Address NEW:
2730 N NORRIS AV
Apply Date:
11/03/2025
Applicant:
Audriana Hurbon
Description:
Remodel Garage to Sleeping Quarters
Permit Reviews
Permit Number - TC-RES-1125-05332
Permit Status: Inspections complete
Permit Description: Remodel Garage to Sleeping Quarters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/21/2026 | ADMINISTRATIVE v.2 | 01/21/2026 | APPROVED |
| 01/06/2026 | RESIDENTIAL ADD/ALT v.2 | 01/13/2026 | APPROVED |
| 01/13/2026 | ADMINISTRATIVE v.1 | 01/13/2026 | REQUIRES RESUBMIT |
| 11/06/2025 | RESIDENTIAL ADD/ALT v.1 | 12/04/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-1125-05332
Permit Status: Inspections complete
Permit Description: Remodel Garage to Sleeping Quarters
| Date | Description | Comments |
|---|---|---|
| 11/06/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 01/13/2026 | Manual J report |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1125-05332
Permit Description: Remodel Garage to Sleeping Quarters
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2026 | COT - RSPL - Rough Soil | Passed | ||
| 02/23/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/17/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/24/2026 | RSBU - Building Final | Passed | 06/24/2026 Corrections made to prior 6/11/26 inspection, verified roof mechanical equipment secured and plastic painted. |
|
| 06/24/2026 | COT - RSEL - Electrical Final | Passed | 06/24/2026 Corrections made to prior 6/11/26 inspection, verified roof mechanical equipment secured and plastic painted. |
|
| 06/24/2026 | COT - RSME - Mechanical Final | Passed | 06/24/2026 Corrections made to prior 6/11/26 inspection, verified roof mechanical equipment secured and plastic painted. |
|
| 06/23/2026 | COT - RSPL - Plumbing Final | Passed | 06/23/2026 Verfied corrections add to 6/11/26 inspection. Added paint to exposed plastic pipes outdoors. |