Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2026 | RSBU - Building Final | Not Ready | ||
| 06/11/2026 | RSBU - Building Final | Not Ready | Provide WR receptacles on exterior locations. Missing smoke detectors. Move over receptacle that is directly behind cook top. Add receptacle right of cook top due to counter top being greater than 12". Water heater incomplete. Coat all exterior pipes. Provide proper stands for electrical disconnects. Provide shielded covers for line sets. Provide ladder for roof access. 6/11/2026 | |
| 06/24/2026 | RSBU - Building Final | Passed | 06/24/2026 Corrections made to prior 6/11/26 inspection, verified roof mechanical equipment secured and plastic painted. |