Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
241 W RILLITO ST
Address NEW:
241 W RILLITO ST
Apply Date:
11/27/2024
Applicant:
Maria Theran
Description:
NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 7.20 kW DC/5.85kW AC& EXISTING SYSTEM - 2.90 KW DERATE MAIN BREAKER FROM (E) 200A TO (N)175A

Permit Reviews

Permit Number - TC-RES-1124-06935
Permit Status: Complete
Permit Description: NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 7.20 kW DC/5.85kW AC& EXISTING SYSTEM - 2.90 KW DERATE MAIN BREAKER FROM (E) 200A TO (N)175A
Start Date Submittal Complete Date Status  
01/09/2025 RESIDENTIAL SOLAR v.2 01/27/2025 APPROVED Review Details
12/03/2024 RESIDENTIAL SOLAR v.1 01/02/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1124-06935
Permite Description: NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 7.20 kW DC/5.85kW AC& EXISTING SYSTEM - 2.90 KW DERATE MAIN BREAKER FROM (E) 200A TO (N)175A
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/05/2025 BULD - Electrical Clearance N/A Re-inspection required 05 FEB 25
Not ready; Plans call for 6 AWG wires, contractor used 8 AWG wires. Please submit revision or use size listed on plan.
02/05/2025 COT - RSOL - Electrical Final Solar Project N/A Re-inspection required 05 FEB 25
Not ready; Plans call for 6 AWG wires, contractor used 8 AWG wires. Please submit revision or use size listed on plan.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1124-06935
Permit Description: NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 7.20 kW DC/5.85kW AC& EXISTING SYSTEM - 2.90 KW DERATE MAIN BREAKER FROM (E) 200A TO (N)175A
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/24/2025 RSBU - Building Final Passed
09/24/2025 BULD - Electrical Clearance Passed 9.24.2025
Corrections made. Clearance for TEP DGC.
09/24/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-MARCOSMORENO01-07-25ENGINEERING2_V2.PDF DOCUMENTS VIEW