Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
1307 W SPEEDWAY BL
Apply Date:
11/19/2024
Applicant:
John Ferrel
Description:
SFR constructed within a Pre-engineered Metal Building

Permit Reviews

Permit Number - TC-RES-1124-06743
Permit Status: Complete
Permit Description: SFR constructed within a Pre-engineered Metal Building
Start Date Submittal Complete Date Status  
06/27/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/01/2025 APPROVED Review Details
06/10/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/12/2025 REQUIRES RESUBMIT Review Details
05/06/2025 RESTAMP - RESIDENTIAL v.1 05/06/2025 APPROVED Review Details
11/21/2024 RESIDENTIAL NEW DWELLING v.1 01/02/2025 REQUIRES RESUBMIT Review Details
04/02/2025 RESIDENTIAL NEW DWELLING v.2 04/21/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-1124-06743
Permit Status: Complete
Permit Description: SFR constructed within a Pre-engineered Metal Building
Date Description Comments
12/10/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
11/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/30/2025 Post-Installed Anchor Inspection Report is required.
04/16/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
04/16/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
06/11/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1124-06743
Permite Description: SFR constructed within a Pre-engineered Metal Building
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
08/12/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Partial Pass Partial pass. Exterior approved. Pending interior framing. 8/12/2025
11/17/2025 COT - BULD - SWG Clearance N/A Partial Pass Partial pass. Underground gas lines approved. Okay to backfill all progress areas. Shading required. 11/17/2025
11/28/2025 COT - RSEL - Electrical Final N/A Not Ready
11/28/2025 COT - RSEL - Outdoor Lighting N/A Not Ready
11/28/2025 COT - RSEL - Grounding/Bonding N/A Not Ready
06/30/2025 COT - RSPL - Yard Water Line N/A Partial Pass Secure blue tracer wire. Install proper riser. 5.28.25
The size of main water line is not per plan. Install proper riser. 6/5/2025
6/30/25: Partial inspection to fill trench and have copper riser inspected later. Corrections have been made per previous notes.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1124-06743
Permit Description: SFR constructed within a Pre-engineered Metal Building
Total Completed Inspections - 19
Date Description Inspector Results Comments
06/04/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
06/04/2025 COT - RSBU - Preslab Passed
06/04/2025 COT - RSPL - Rough Soil Passed
08/12/2025 COT - RSBU - Roof Nailing Passed
08/26/2025 BULD - Electrical Clearance Passed 8.26.25
Approved
10/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/16/2025 COT - RSBU - Interior Shear Bracing Passed Interior framing; Intermediate inspections completed at this time. OK to insulate and sheet rock throughout.
10/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/17/25
Passed by J.B. On 16 Oct 25.
12/17/2025 COT - RSPL - Gas Pressure Test Passed
12/17/2025 COT - BULD - SWG Clearance Passed
12/19/2025 COT - RSEL - Electrical Final Passed
12/19/2025 COT - RSPL - Plumbing Final Passed
12/19/2025 COT - RSEL - Outdoor Lighting Passed
12/19/2025 COT - RSEL - Grounding/Bonding Passed
01/09/2026 COT - RSPL - Sewer Passed
01/09/2026 COT - RSPL - Yard Water Line Passed
01/09/2026 RSBU - Building Final Passed
01/09/2026 COT - RSEL - Electrical Underground Passed
01/09/2026 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
2_FERREL RES SIGNED SPEC INSPECT CERTIF.0627225-2025-06-27_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PRE-ENG-BLDG_FERREL_CALC_PKG SEALED-03192025_V1.PDF DOCUMENTS VIEW
PRE-ENG-BLDG_FERREL_DRAWING-SEALED-03192025_V1.PDF DOCUMENTS VIEW
FERRELL OWNER BLDG AFFIDAVIT MAR312025_V1.PDF DOCUMENTS VIEW
24219 MJ FERRELL RES REV1_V1.PDF DOCUMENTS VIEW
CONS-2_PLAN_SET_FERRELL NEW RES REV CDS JM.032025_V2.PDF DOCUMENTS VIEW