Permit: TC-RES-1124-06645
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
4533 S 7TH AV
Address NEW:
4533 S 7TH AV
Apply Date:
11/14/2024
Applicant:
Charles Corrales
Description:
Duplex
Permit Reviews
Permit Number - TC-RES-1124-06645
Permit Status: Inspections complete
Permit Description: Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2025 | RESIDENTIAL NEW DWELLING v.4 | 08/22/2025 | REQUIRES RESUBMIT |
| 11/22/2024 | RESIDENTIAL NEW DWELLING v.1 | 12/22/2024 | REQUIRES RESUBMIT |
| 01/22/2026 | ADMINISTRATIVE v.2 | 01/22/2026 | APPROVED |
| 09/16/2025 | ADMINISTRATIVE v.1 | 09/16/2025 | REQUIRES RESUBMIT |
| 09/12/2025 | RESIDENTIAL NEW DWELLING v.5 | 09/12/2025 | APPROVED |
| 09/12/2025 | RESTAMP - RESIDENTIAL v.1 | 09/16/2025 | APPROVED |
| 07/22/2025 | RESIDENTIAL NEW DWELLING v.2 | 07/22/2025 | REQUIRES RESUBMIT |
| 07/23/2025 | RESIDENTIAL NEW DWELLING v.3 | 08/06/2025 | REQUIRES RESUBMIT |
| 07/31/2026 | RESIDENTIAL NEW DWELLING REVISION v.1 | 08/10/2026 | APPROVED |
Conditions
Permit Number - TC-RES-1124-06645
Permit Status: Inspections complete
Permit Description: Duplex
| Date | Description | Comments |
|---|---|---|
| 04/16/2025 | The plans submitted appear to be for a Duplex. The address location does not have Units attached to the address. Unit #'s will have to be confirmed and assigned to Permit Application and on Plans prior to issuance. Once Zoning approves contact Pima County Addressing to resolve issue Addressing@pima.gov or 520-724-9512. Please submit Address Change Request to update and submit approved plans without our City stamps (with primary address and unit #'s on ALL plan sheets and documents) and a comment response letter, indicating that this is a re-stamp to resolve the addressing issue. | |
| 08/03/2026 | Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 11/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/22/2025 | Parcel is located within a regulatory floodplain. Engineering review required prior to issuance, floodplain use permit may be required. A grading development package is required to be submitted and approved prior to approval of this permit. | |
| 12/11/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/11/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 12/11/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1124-06645
Permite Description: Duplex
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2026 | COT - RSBU - Preslab | N/A | Not Ready | |
| 02/19/2026 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 03/10/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 3/10/26: Roof must be loaded for intermediate inspection, address required on units to verify correct location. STOPPED INSPECTION |
| 03/13/2026 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required (with fee) | 3-13-26: seal penetrations at firewall and at roofline. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1124-06645
Permit Description: Duplex
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2026 | COT - RSPL - Rough Soil | Passed | 2-19-26: underground plumbing approved. Okay to backfill using shading materials. | |
| 03/04/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 03/04/2026 Corrections made to prior inspection. |
|
| 03/04/2026 | COT - RSBU - Roof Nailing | Passed | 03/04/2026 Corrections made to prior inspection. |
|
| 03/06/2026 | COT - RSBU - Preslab | Passed | ||
| 03/06/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/13/2026 | COT - RSEL - Grounding/Bonding | Passed | 3-14-26: approved. | |
| 03/16/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/16/2026 All corrections made to prior inspection, added Boca plate at DWV. |
|
| 03/20/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | 3/20/2026 Verified nail schedule and sealed openings at firewall. |
|
| 03/23/2026 | BULD - Electrical Clearance | Passed | 3-23-26: okay to energize panels 1 & 2. ECO clearance issued to TEP. | |
| 05/27/2026 | COT - RSPL - Sewer | Passed | 5/27/2026 Okay to backfill, backwater valve installed. |
|
| 07/01/2026 | COT - RSPL - Yard Water Line | Passed | 07/01/2026 1" PEX line with blue tracer wire holding under test from meter to riser. Okay to backfill, shading required. DUPLICATE |
|
| 08/10/2026 | COT - RSME - Mechanical Final | Passed | 8-10-26: mechanical final approved. | |
| 08/12/2026 | COT - RSEL - Electrical Final | Passed | Corrections made and verified | |
| 08/12/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/12/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 08/12/2026 | RSBU - Building Final | Passed | ||
| 08/14/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/17/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |