Permit: TC-RES-1123-09821
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5255 S MISSIONDALE RD
Address NEW:
5255 S MISSIONDALE RD
Apply Date:
11/30/2023
Applicant:
Inai Maldonado
Description:
SFR & Sleeping Quarters
Permit Reviews
Permit Number - TC-RES-1123-09821
Permit Status: Complete
Permit Description: SFR & Sleeping Quarters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/04/2024 | RESIDENTIAL NEW DWELLING v.2 | 03/26/2024 | APPROVED |
| 10/02/2024 | RESIDENTIAL NEW DWELLING v.1 | 10/03/2024 | APPROVED |
| 06/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/11/2025 | APPROVED |
| 05/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/16/2025 | REQUIRES RESUBMIT |
| 12/05/2023 | RESIDENTIAL NEW DWELLING v.1 | 01/02/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-1123-09821
Permit Status: Complete
Permit Description: SFR & Sleeping Quarters
| Date | Description | Comments |
|---|---|---|
| 03/26/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/02/2024 | An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. | |
| 05/02/2024 | Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. | |
| 12/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 12/14/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-1123-09821
Permite Description: SFR & Sleeping Quarters
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 10/22/24: properly seal all penetrations through vapor barrier and top plate, secure gas piping on vertical and horizontal runs, all metallic boxes must be grounded, address tag missing at panel, plans call for 400amp service, sub panel requires ground busbar, gas piping must be grounded, transition glue at abs and pvc not allowed, outlet missing at guest house at kitchen wall, properly secure condensate drain. B-vent must be properly secured with 1 inch clearance from combustibles, BOCA plates required throughout at dryer vent and plumbing. Stopped inspection more items may be added |
| 10/22/2024 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/22/2024 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1123-09821
Permit Description: SFR & Sleeping Quarters
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2024 | COT - RSPL - Rough Soil | Passed | 8/7/24: plumbing underground per plans ok to proceed with backfill. Shading required | |
| 08/19/2024 | COT - RSBU - Preslab and floodplain | Passed | ||
| 08/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/16/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 09/18/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved. All corrections were made. 9/18/2024 | |
| 10/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | All corrections were made. Approved. 10/29/2024 | |
| 10/29/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/29/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 10/29/2024 | |
| 05/07/2025 | COT - RSEL - Outdoor Lighting | Passed | 5-7-25, outdoor lighting approved. | |
| 05/14/2025 | COT - RSME - Mechanical Final | Passed | 5-14-25, mechanical final approved | |
| 05/14/2025 | COT - RSPL - Yard Water Line | Passed | 5-14-25, approved | |
| 05/14/2025 | COT - RSPL - Plumbing Final | Passed | 5-14-25, plumbing final approved. | |
| 05/14/2025 | COT - RSEL - Grounding/Bonding | Passed | 5-14-25, grounding/bonding approved. | |
| 05/14/2025 | COT - RSEL - Electrical Underground | Passed | 5-14-25, approved | |
| 05/14/2025 | COT - RSPL - Sewer | Passed | 5-14-25, previously inspected and approved. | |
| 05/14/2025 | RSBU - Building Final | Passed | 5-14-25, building final approved. | |
| 05/14/2025 | COT - RSEL - Electrical Final | Passed | 5-14-25, electrical final approved. |