Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
8702 E BAKER ST
Address NEW:
8702 E BAKER ST
Apply Date:
11/27/2023
Applicant:
Jake Boen
Description:
Fire Restoration CE-VIO0523-03657

Permit Reviews

Permit Number - TC-RES-1123-09748
Permit Status: Inspections
Permit Description: Fire Restoration CE-VIO0523-03657
Start Date Submittal Complete Date Status  
11/30/2023 RESIDENTIAL NEW DWELLING v.1 12/20/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-1123-09748
Permite Description: Fire Restoration CE-VIO0523-03657
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/26/2024 COT - RSPL - Plumbing Final N/A Re-inspection required 9/26/24: garage was completed before inspection need to see top plate penetrations. All Receptacles in garage need to be GFCI protected. Some receptacles call to be 48" off the ground.
03/07/2024 COT - RSEL - Electrical Final N/A Re-inspection required 2/29/24: not ready
3/7/24: electrical final will need to be called when project is complete.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-1123-09748
Permit Description: Fire Restoration CE-VIO0523-03657
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/29/2024 COT - RSEL - Grounding/Bonding Passed
02/29/2024 BULD - Electrical Clearance Passed 2/29/24: 8702 E BAKER ST INCR OK TO ENERGIZE TEP Verbal CLEARANCE at 1:53pm
03/07/2024 COT - RSBU - Roof Nailing Passed 3/7/24: framing per plan. Ok to proceed.
04/15/2024 COT - BULD - SWG Clearance Passed Approved pressure test, SWG Clearance is required for the reconnection
04/15/2024 COT - RSPL - Gas Pressure Test Passed
10/18/2024 COT - RSEL - Electrical Final Passed 10/18/24: Penetrations are foamed, receptacles in garage are protected by a GFCI receptacle on load side. Fire restoration work is complete. Okay to close out permit.
10/18/2024 RSBU - Building Final Passed 10/18/24: Penetrations are foamed, receptacles in garage are protected by a GFCI receptacle on load side. Fire restoration work is complete. Okay to close out permit.
10/18/2024 COT - RSME - Mechanical Final Passed 10/18/24: Penetrations are foamed, receptacles in garage are protected by a GFCI receptacle on load side. Fire restoration work is complete. Okay to close out permit.
10/23/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-DRAWING SET_V1.PDF DOCUMENTS VIEW