Permit: TC-RES-1123-09748
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
8702 E BAKER ST
Address NEW:
8702 E BAKER ST
Apply Date:
11/27/2023
Applicant:
Jake Boen
Description:
Fire Restoration CE-VIO0523-03657
Permit Reviews
Permit Number - TC-RES-1123-09748
Permit Status: Inspections
Permit Description: Fire Restoration
CE-VIO0523-03657
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/30/2023 | RESIDENTIAL NEW DWELLING v.1 | 12/20/2023 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1123-09748
Permite Description: Fire Restoration
CE-VIO0523-03657
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 9/26/24: garage was completed before inspection need to see top plate penetrations. All Receptacles in garage need to be GFCI protected. Some receptacles call to be 48" off the ground. |
| 03/07/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 2/29/24: not ready 3/7/24: electrical final will need to be called when project is complete. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1123-09748
Permit Description: Fire Restoration
CE-VIO0523-03657
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/29/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 02/29/2024 | BULD - Electrical Clearance | Passed | 2/29/24: 8702 E BAKER ST INCR OK TO ENERGIZE TEP Verbal CLEARANCE at 1:53pm | |
| 03/07/2024 | COT - RSBU - Roof Nailing | Passed | 3/7/24: framing per plan. Ok to proceed. | |
| 04/15/2024 | COT - BULD - SWG Clearance | Passed | Approved pressure test, SWG Clearance is required for the reconnection | |
| 04/15/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/18/2024 | COT - RSEL - Electrical Final | Passed | 10/18/24: Penetrations are foamed, receptacles in garage are protected by a GFCI receptacle on load side. Fire restoration work is complete. Okay to close out permit. | |
| 10/18/2024 | RSBU - Building Final | Passed | 10/18/24: Penetrations are foamed, receptacles in garage are protected by a GFCI receptacle on load side. Fire restoration work is complete. Okay to close out permit. | |
| 10/18/2024 | COT - RSME - Mechanical Final | Passed | 10/18/24: Penetrations are foamed, receptacles in garage are protected by a GFCI receptacle on load side. Fire restoration work is complete. Okay to close out permit. | |
| 10/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |