Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
743 N 10TH AV
Address NEW:
743 N 10TH AV
Apply Date:
11/04/2022
Applicant:
Marytine Ramos
Description:
Installation of 7.20KW PV System-REV1:Module type changed to SEG SOLAR SEG-400-BMD-HV 400W. Lay-out, and system size was changed. 3 additional panels were installed. Roof type changed to metal roof. REV2-Address change only 745 N 10th Av. to 743 N 10th Av.

Permit Reviews

Permit Number - TC-RES-1122-00461
Permit Status: Complete
Permit Description: Installation of 7.20KW PV System-REV1:Module type changed to SEG SOLAR SEG-400-BMD-HV 400W. Lay-out, and system size was changed. 3 additional panels were installed. Roof type changed to metal roof. REV2-Address change only 745 N 10th Av. to 743 N 10th Av.
Start Date Submittal Complete Date Status  
02/14/2023 RESIDENTIAL SOLAR v.2 02/15/2023 APPROVED Review Details
01/05/2023 RESIDENTIAL SOLAR v.1 01/26/2023 REQUIRES RESUBMIT Review Details
11/12/2022 RESIDENTIAL SOLAR v.1 12/13/2022 APPROVED Review Details
07/13/2023 RESIDENTIAL SOLAR v.1 07/13/2023 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1122-00461
Permit Description: Installation of 7.20KW PV System-REV1:Module type changed to SEG SOLAR SEG-400-BMD-HV 400W. Lay-out, and system size was changed. 3 additional panels were installed. Roof type changed to metal roof. REV2-Address change only 745 N 10th Av. to 743 N 10th Av.
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/23/2023 COT - RSEL - Electrical Final Passed Approved, DGC Clearance to TEP is required for the solar meter
02/23/2023 RSBU - Building Final Passed
07/17/2023 BULD - Electrical Clearance Passed Duplicate inspection. Meter has been placed. Permit was pending due to an address change. 7/17/2023
07/17/2023 COT - RSOL - Electrical Final Solar Project Passed Duplicate inspection. Meter has been placed. Permit was pending due to an address change. 7/17/2023

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REVISED STAMPED PLAN SET_V2.PDF DOCUMENTS VIEW
PE LETTER_V1.PDF DOCUMENTS VIEW
REVISION LETTER_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATION_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-P-0001089630-ANDERSON_CAD 2_V1.PDF DOCUMENTS VIEW