Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4150 E 1ST ST
Address NEW:
4150 E 1ST ST
Apply Date:
10/29/2024
Applicant:
TFS Solar
Description:
Roof mount 4.73kW DC photovoltaic solar system; 11 AC modules, 2 branches, PV Combiner Box, 30A PV breaker on 225A bus with 200A MCB, new PV-ready service panel (CUTOVER). New 125A Main lug only subpanel to replace existing MSP.

Permit Reviews

Permit Number - TC-RES-1024-06275
Permit Status: Complete
Permit Description: Roof mount 4.73kW DC photovoltaic solar system; 11 AC modules, 2 branches, PV Combiner Box, 30A PV breaker on 225A bus with 200A MCB, new PV-ready service panel (CUTOVER). New 125A Main lug only subpanel to replace existing MSP.
Start Date Submittal Complete Date Status  
10/30/2024 RESIDENTIAL SOLAR v.1 12/02/2024 APPROVED Review Details
12/24/2024 RESIDENTIAL SOLAR REVISION v.1 01/27/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-1024-06275
Permit Status: Complete
Permit Description: Roof mount 4.73kW DC photovoltaic solar system; 11 AC modules, 2 branches, PV Combiner Box, 30A PV breaker on 225A bus with 200A MCB, new PV-ready service panel (CUTOVER). New 125A Main lug only subpanel to replace existing MSP.
Date Description Comments
01/03/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1024-06275
Permit Description: Roof mount 4.73kW DC photovoltaic solar system; 11 AC modules, 2 branches, PV Combiner Box, 30A PV breaker on 225A bus with 200A MCB, new PV-ready service panel (CUTOVER). New 125A Main lug only subpanel to replace existing MSP.
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/19/2025 RSBU - Building Final Passed
02/19/2025 COT - RSOL - Grounding/Bonding Solar Project Passed
02/19/2025 COT - RSOL - Electrical Final Solar Project Passed
02/19/2025 BULD - Electrical Clearance Passed Approved -DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV1 WEISE BRUCE PV 4.73KW - DRAWINGS_V1.PDF DOCUMENTS VIEW
REV1 WEISE BRUCE PV PERMIT REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-WEISE BRUCE PV 4.73KW-DRAWINGS_V1.PDF DOCUMENTS VIEW
WEISE BRUCE PV 4.73KW-SPECS_V1.PDF DOCUMENTS VIEW