Permit: TC-RES-1024-06275
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4150 E 1ST ST
Address NEW:
4150 E 1ST ST
Apply Date:
10/29/2024
Applicant:
TFS Solar
Description:
Roof mount 4.73kW DC photovoltaic solar system; 11 AC modules, 2 branches, PV Combiner Box, 30A PV breaker on 225A bus with 200A MCB, new PV-ready service panel (CUTOVER). New 125A Main lug only subpanel to replace existing MSP.
Permit Reviews
Permit Number - TC-RES-1024-06275
Permit Status: Complete
Permit Description: Roof mount 4.73kW DC photovoltaic solar system; 11 AC modules, 2 branches, PV Combiner Box, 30A PV breaker on 225A bus with 200A MCB, new PV-ready service panel (CUTOVER). New 125A Main lug only subpanel to replace existing MSP.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/30/2024 | RESIDENTIAL SOLAR v.1 | 12/02/2024 | APPROVED |
| 12/24/2024 | RESIDENTIAL SOLAR REVISION v.1 | 01/27/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1024-06275
Permit Status: Complete
Permit Description: Roof mount 4.73kW DC photovoltaic solar system; 11 AC modules, 2 branches, PV Combiner Box, 30A PV breaker on 225A bus with 200A MCB, new PV-ready service panel (CUTOVER). New 125A Main lug only subpanel to replace existing MSP.
| Date | Description | Comments |
|---|---|---|
| 01/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-1024-06275
Permit Description: Roof mount 4.73kW DC photovoltaic solar system; 11 AC modules, 2 branches, PV Combiner Box, 30A PV breaker on 225A bus with 200A MCB, new PV-ready service panel (CUTOVER). New 125A Main lug only subpanel to replace existing MSP.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2025 | RSBU - Building Final | Passed | ||
| 02/19/2025 | COT - RSOL - Grounding/Bonding Solar Project | Passed | ||
| 02/19/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 02/19/2025 | BULD - Electrical Clearance | Passed | Approved -DGC Clearance to TEP is required for the solar meter |