Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2025 | BULD - Electrical Clearance | Passed | partial pass pending solar, upgrade per code, grounding and bonding present 1/29/25 CLEARANCE INCR Called Marcia 10:25 to restore power |
|
| 02/19/2025 | BULD - Electrical Clearance | Passed | Approved -DGC Clearance to TEP is required for the solar meter |