Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address NEW:
2715 E ADAMS ST UNIT 2
Apply Date:
10/24/2024
Applicant:
Chelsea Marshall
Description:
Accessory Dwelling Unit (ADU)

Permit Reviews

Permit Number - TC-RES-1024-06207
Permit Status: Inspections complete
Permit Description: Accessory Dwelling Unit (ADU)
Start Date Submittal Complete Date Status  
07/17/2025 RESTAMP - RESIDENTIAL v.1 07/17/2025 IN REVIEW Review Details
10/25/2024 RESIDENTIAL NEW DWELLING v.1 12/05/2024 REQUIRES RESUBMIT Review Details
07/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 07/17/2025 REQUIRES RESUBMIT Review Details
09/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 09/19/2025 REQUIRES RESUBMIT Review Details
05/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/29/2025 REQUIRES RESUBMIT Review Details
01/17/2025 RESIDENTIAL NEW DWELLING v.2 02/03/2025 APPROVED Review Details
10/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.4 10/02/2025 APPROVED Review Details
07/18/2025 RESIDENTIAL NEW DWELLING REVISION v.1 08/13/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-1024-06207
Permit Status: Inspections complete
Permit Description: Accessory Dwelling Unit (ADU)
Date Description Comments
11/07/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
01/17/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/19/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/27/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1024-06207
Permite Description: Accessory Dwelling Unit (ADU)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/26/2025 COT - RSBU - Masonry Pregrout N/A Partial Pass 9/26/25, partial pass, ok to proceed to final lift
12/18/2025 COT - RSEL - Outdoor Lighting N/A Not Ready
12/18/2025 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-1024-06207
Permit Description: Accessory Dwelling Unit (ADU)
Total Completed Inspections - 18
Date Description Inspector Results Comments
04/28/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Reinforcements, hold downs and footings per plan at pad. Total of three steel column footings per plan. Okay for concrete placement. 4/28/2025
04/28/2025 COT - RSBU - Preslab Passed Reinforcements, hold downs and footings per plan at pad. Total of three steel column footings per plan. Okay for concrete placement. 4/28/2025
05/22/2025 COT - RSBU - Roof Nailing Passed
05/22/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/08/2025 COT - RSPL - Rough Soil Passed
07/15/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7.15.25
Electrical at BUILDING not panel is per plans. Pending revision for clearance but circuits and receptacles are good. DWV verified under test. Gas verified under test. Firefoam verified. Pex supported throughout. Windows on backorder. OK to cover ceiling as requested.
07/15/2025 COT - RSEL - Grounding/Bonding Passed 5.25.15
Existing and new grounds and bonds verified.
07/15/2025 COT - RSPL - Gas Pressure Test Passed 5.15.25
Gas under test verified.
07/16/2025 COT - RSPL - Yard Water Line Passed 7.16.25
Blue tracer present. Schedule 40 pvc. Depth verified. Line under test. Ok to backfill
09/26/2025 COT - BULD - SWG Clearance Passed Passed 9/26/25
09/26/2025 COT - RSEL - Electrical Underground Passed Passed 9/26/25
10/07/2025 COT - RSBU - Masonry Pregrout Passed
10/30/2025 BULD - Electrical Clearance Passed TEP CLEARANCE: INCR, 2715 main house. This is a new dual meter. Unit 2 has a meter, TEP had customer install 400A dual pack.
12/18/2025 COT - RSME - Mechanical Final Passed
12/18/2025 COT - RSPL - Plumbing Final Passed
12/18/2025 COT - RSEL - Electrical Final Passed
02/04/2026 COT - RSEL - Outdoor Lighting Passed Passed final 2/4/26
02/04/2026 RSBU - Building Final Passed Passed final 2/4/26

Documents

File Name Document Type  
SI CERTIFICATE-2025-09-26_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PERMIT TC-RES-1024-06207 REV NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-1_PLAN SET_V2_V2.PDF DOCUMENTS VIEW