Permit: TC-RES-1024-06207
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
2715 E ADAMS ST UNIT 2
Address NEW:
2715 E ADAMS ST UNIT 2
Apply Date:
10/24/2024
Applicant:
Chelsea Marshall
Description:
Accessory Dwelling Unit (ADU)
Permit Reviews
Permit Number - TC-RES-1024-06207
Permit Status: Inspections complete
Permit Description: Accessory Dwelling Unit (ADU)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2025 | RESTAMP - RESIDENTIAL v.1 | 07/17/2025 | IN REVIEW |
| 10/25/2024 | RESIDENTIAL NEW DWELLING v.1 | 12/05/2024 | REQUIRES RESUBMIT |
| 07/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/17/2025 | REQUIRES RESUBMIT |
| 09/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 09/19/2025 | REQUIRES RESUBMIT |
| 05/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/29/2025 | REQUIRES RESUBMIT |
| 01/17/2025 | RESIDENTIAL NEW DWELLING v.2 | 02/03/2025 | APPROVED |
| 10/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 10/02/2025 | APPROVED |
| 07/18/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 08/13/2025 | APPROVED |
Conditions
Permit Number - TC-RES-1024-06207
Permit Status: Inspections complete
Permit Description: Accessory Dwelling Unit (ADU)
| Date | Description | Comments |
|---|---|---|
| 11/07/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 01/17/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/19/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 01/27/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1024-06207
Permite Description: Accessory Dwelling Unit (ADU)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2025 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | 9/26/25, partial pass, ok to proceed to final lift |
| 12/18/2025 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 12/18/2025 | RSBU - Building Final | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-1024-06207
Permit Description: Accessory Dwelling Unit (ADU)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Reinforcements, hold downs and footings per plan at pad. Total of three steel column footings per plan. Okay for concrete placement. 4/28/2025 | |
| 04/28/2025 | COT - RSBU - Preslab | Passed | Reinforcements, hold downs and footings per plan at pad. Total of three steel column footings per plan. Okay for concrete placement. 4/28/2025 | |
| 05/22/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 05/22/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/08/2025 | COT - RSPL - Rough Soil | Passed | ||
| 07/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7.15.25 Electrical at BUILDING not panel is per plans. Pending revision for clearance but circuits and receptacles are good. DWV verified under test. Gas verified under test. Firefoam verified. Pex supported throughout. Windows on backorder. OK to cover ceiling as requested. |
|
| 07/15/2025 | COT - RSEL - Grounding/Bonding | Passed | 5.25.15 Existing and new grounds and bonds verified. |
|
| 07/15/2025 | COT - RSPL - Gas Pressure Test | Passed | 5.15.25 Gas under test verified. |
|
| 07/16/2025 | COT - RSPL - Yard Water Line | Passed | 7.16.25 Blue tracer present. Schedule 40 pvc. Depth verified. Line under test. Ok to backfill |
|
| 09/26/2025 | COT - BULD - SWG Clearance | Passed | Passed 9/26/25 | |
| 09/26/2025 | COT - RSEL - Electrical Underground | Passed | Passed 9/26/25 | |
| 10/07/2025 | COT - RSBU - Masonry Pregrout | Passed | ||
| 10/30/2025 | BULD - Electrical Clearance | Passed | TEP CLEARANCE: INCR, 2715 main house. This is a new dual meter. Unit 2 has a meter, TEP had customer install 400A dual pack. | |
| 12/18/2025 | COT - RSME - Mechanical Final | Passed | ||
| 12/18/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 12/18/2025 | COT - RSEL - Electrical Final | Passed | ||
| 02/04/2026 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/4/26 | |
| 02/04/2026 | RSBU - Building Final | Passed | Passed final 2/4/26 |