Permit: TC-RES-1024-05829
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
8500 E GREEN ACRES DR
Address NEW:
8500 E GREEN ACRES DR
Apply Date:
10/08/2024
Applicant:
Benjamin Howayeck
Description:
ADU
Permit Reviews
Permit Number - TC-RES-1024-05829
Permit Status: Inspections
Permit Description: ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/12/2024 | RESIDENTIAL NEW DWELLING v.2 | 12/18/2024 | REQUIRES RESUBMIT |
| 10/10/2024 | RESIDENTIAL NEW DWELLING v.1 | 10/10/2024 | REQUIRES RESUBMIT |
| 12/31/2024 | RESTAMP - RESIDENTIAL v.1 | 01/08/2025 | APPROVED |
| 12/30/2024 | RESIDENTIAL NEW DWELLING v.3 | 12/31/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-1024-05829
Permit Status: Inspections
Permit Description: ADU
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/26/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 12/31/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
Conditions
Permit Number - TC-RES-1024-05829
Permit Status: Inspections
Permit Description: ADU
| Date | Description | Comments |
|---|---|---|
| 12/30/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-1024-05829
Permite Description: ADU
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 3-19-25, walk exterior sheathing-nailing on sheathing along the edges/splices not per plan- plans call for 4" o.c. Also, add nails at sheathing where nails over penetrated osb, add shot pins to marked locations, missing Simpsons ties at porch beam, provide truss calcs. Reinspection required. |
| 08/08/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 1. Missing Water-hammer arrestor at icemaker. 2. Half of the receptacles in the interior have no power, the exterior receptacle are also dead. Might be a bad GFCI. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-1024-05829
Permit Description: ADU
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2025 | COT - RSPL - Rough Soil | Passed | 1-31-25, underground plumbing verified as per approved plans. Okay to backfill. | |
| 02/20/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2-20-25, excavation/rebar, preslab approved. Okay to pour concrete. | |
| 02/20/2025 | COT - RSBU - Preslab | Passed | 2-20-25, preslab approved. Okay to pour concrete. | |
| 04/02/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/2/25 corrections made ok to lathe | |
| 04/02/2025 | COT - RSEL - Electrical Underground | Passed | Passed 4/2/25 ok to backfill | |
| 04/02/2025 | COT - RSBU - Roof Nailing | Passed | 4/2/25 corrections made ok to lathe | |
| 04/10/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 05/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/08/2025 | COT - RSME - Mechanical Final | Passed | ||
| 08/08/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/13/2025 | RSBU - Building Final | Passed | 8/13/25 corrections made |