Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
04/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 1-1-Dry in ADU. 2- Install feeders for sub-Panel. 3- Connect Ufer to sub panel. 4- Complete fire-blocking at gables (2 by 4 does not work on 2 by 6 walls). 5- Provide evaluation from architect of platform framed walls in lieu of balloon framed walls, per plans,at gable ends to verify that hinge which has been created will not cause issues and are acceptable. 6- Frame in Attic access opening capable of allowing air handler to be replaced. 7- Install stud shoes at shower wall studs that are over-notched/over-drilled.
05/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed