Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
926 W MACARTHUR ST
Apply Date:
10/03/2023
Applicant:
Bailey Randall
Description:
Roof Mounted PV System DC SYSTEM SIZE (kW): 9.6 kW / AC SYSTEM SIZE (kW): 6.96 kW With Main service panel upgrade 24 modules

Permit Reviews

Permit Number - TC-RES-1023-08500
Permit Status: Complete
Permit Description: Roof Mounted PV System DC SYSTEM SIZE (kW): 9.6 kW / AC SYSTEM SIZE (kW): 6.96 kW With Main service panel upgrade 24 modules
Start Date Submittal Complete Date Status  
12/22/2023 RESIDENTIAL SOLAR v.1 01/02/2024 REQUIRES RESUBMIT Review Details
09/09/2024 RESIDENTIAL SOLAR REVISION v.1 09/10/2024 REQUIRES RESUBMIT Review Details
10/03/2023 RESIDENTIAL SOLAR v.1 10/16/2023 APPROVED Review Details
09/17/2024 RESIDENTIAL SOLAR REVISION v.2 09/27/2024 APPROVED Review Details
01/16/2024 RESIDENTIAL SOLAR v.2 01/19/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-1023-08500
Permite Description: Roof Mounted PV System DC SYSTEM SIZE (kW): 9.6 kW / AC SYSTEM SIZE (kW): 6.96 kW With Main service panel upgrade 24 modules
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/13/2023 BULD - Electrical Clearance N/A Partial Pass INCR ok for cutover future solar.
11/14/2024 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-1023-08500
Permit Description: Roof Mounted PV System DC SYSTEM SIZE (kW): 9.6 kW / AC SYSTEM SIZE (kW): 6.96 kW With Main service panel upgrade 24 modules
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/14/2024 RSBU - Building Final Passed
11/14/2024 COT - RSOL - Electrical Final Solar Project Passed
11/14/2024 COT - RSOL - Grounding/Bonding Solar Project Passed
11/14/2024 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
238363_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
238364_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-209476_STRUCTURAL_ENGINEERING (1)_V2.PDF DOCUMENTS VIEW
RESPONSE LETTER- TC-RES-1123-09392_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
194467_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
CONS-194468_STRUCTURAL_ENGINEERING_V1.PDF DOCUMENTS VIEW
VSUN-400-108M-BB (6) COP COPY 15_V1.PDF DOCUMENTS VIEW