Permit: TC-RES-0925-04730
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1358 N APACHE DR UNIT 1
Address NEW:
1358 N APACHE DR UNIT 1
Apply Date:
09/25/2025
Applicant:
GGV Designs
Description:
Duplex
Permit Reviews
Permit Number - TC-RES-0925-04730
Permit Status: Complete
Permit Description: Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/25/2026 | APPROVED |
| 01/22/2026 | ADMINISTRATIVE v.2 | 01/22/2026 | VOID |
| 05/05/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/06/2026 | APPROVED |
| 09/30/2025 | RESIDENTIAL NEW DWELLING v.1 | 10/24/2025 | REQUIRES RESUBMIT |
| 11/14/2025 | ADMINISTRATIVE v.1 | 11/14/2025 | REQUIRES RESUBMIT |
| 11/06/2025 | RESIDENTIAL NEW DWELLING v.2 | 11/14/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0925-04730
Permit Status: Complete
Permit Description: Duplex
| Date | Description | Comments |
|---|---|---|
| 10/09/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 09/30/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/09/2025 | Manual J report | |
| 10/09/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/09/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04730
Permite Description: Duplex
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2026 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | |
| 06/17/2026 | BULD - Electrical Clearance | N/A | Not Applicable | 06/17/2026 Passed on 3/31/26. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04730
Permit Description: Duplex
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2026 | COT - RSPL - Rough Soil | Passed | Ok to cover progress areas. | |
| 02/04/2026 | COT - RSBU - Preslab | Passed | Ensure slab area is termite treated before placing concrete | |
| 02/04/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Ensure ufer is in place before placing concrete in footings. | |
| 02/17/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/17/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 02/17/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 02/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and sheet rock. | |
| 04/10/2026 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 4/10/2026 | |
| 04/15/2026 | COT - RSPL - Sewer | Passed | Passed 4/15/26 | |
| 06/17/2026 | RSBU - Building Final | Passed | ||
| 06/17/2026 | COT - RSEL - Electrical Final | Passed | 06/17/2026 Verified changed over-amped AC breakers to 30A at subpanels. |
|
| 06/17/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 06/17/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/17/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/17/2026 | COT - RSPL - Plumbing Final | Passed |