Permit: TC-RES-0925-04721
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6709 S MISSIONDALE RD
Address NEW:
6709 S MISSIONDALE RD
Apply Date:
09/25/2025
Applicant:
Crystian Duarte
Description:
REV1: Electrical updates Storage
Permit Reviews
Permit Number - TC-RES-0925-04721
Permit Status: Complete
Permit Description: REV1: Electrical updates
Storage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2026 | RESIDENTIAL NEW DWELLING REVISION v.3 | 05/20/2026 | APPROVED |
| 09/30/2025 | RESIDENTIAL ADD/ALT v.1 | 10/31/2025 | REQUIRES RESUBMIT |
| 12/11/2025 | ADMINISTRATIVE v.1 | 12/11/2025 | REQUIRES RESUBMIT |
| 11/17/2025 | RESIDENTIAL ADD/ALT v.1 | 12/11/2025 | APPROVED |
| 01/09/2026 | ADMINISTRATIVE v.2 | 01/09/2026 | APPROVED |
| 04/06/2026 | RESIDENTIAL NEW DWELLING REVISION v.1 | N/A | REQUIRES RESUBMIT |
| 11/13/2025 | RESIDENTIAL ADD/ALT v.2 | 11/17/2025 | APPROVED |
| 04/17/2026 | RESIDENTIAL NEW DWELLING REVISION v.2 | N/A | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0925-04721
Permit Status: Complete
Permit Description: REV1: Electrical updates
Storage
| Date | Description | Comments |
|---|---|---|
| 09/30/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04721
Permite Description: REV1: Electrical updates
Storage
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2026 | RSBU - Building Final | N/A | Partial Pass | 4-7-26: pending revision approval. |
| 03/31/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04721
Permit Description: REV1: Electrical updates
Storage
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2026 | COT - RSPL - Rough Soil | Passed | 02/10/2026 Approved per plan. Verified DWV holding under test for 15min, added green tracer wire to DWV pipe not protected under slab. Okay to backfill, shading material required. |
|
| 03/05/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 03/05/2026 Corrections made to prior inspection. Okay for concrete placement. |
|
| 03/25/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 3.25.26 Approved, proceed to next steps |
|
| 03/27/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 05/19/2026 | RSBU - Building Final | Passed | 5.19.26 Approved |
|
| 05/22/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 05/22/2026 Revised plans received. |
|
| 05/22/2026 | COT - RSEL - Electrical Final | Passed |