Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Rough SoilÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2026 | COT - RSPL - Rough Soil | Passed | 02/10/2026 Approved per plan. Verified DWV holding under test for 15min, added green tracer wire to DWV pipe not protected under slab. Okay to backfill, shading material required. |