Permit: TC-RES-0925-04698
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2310 E HAWTHORNE ST
Address NEW:
2310 E HAWTHORNE ST
Apply Date:
09/24/2025
Applicant:
TFS Solar
Description:
REV_1, Equipment relocation; 20 kWh Storage addition to existing pv system. 2 Enphase 10C batteries. IQ combiner for PV and Batteries. 200A bus with 200A MCB, interconnection via PCS, Enphase Meter Collar for whole home backup. Remove existing meter socket adapted for installation of Enphase meter collar.
Permit Reviews
Permit Number - TC-RES-0925-04698
Permit Status: Complete
Permit Description: REV_1, Equipment relocation; 20 kWh Storage addition to existing pv system. 2 Enphase 10C batteries. IQ combiner for PV and Batteries. 200A bus with 200A MCB, interconnection via PCS, Enphase Meter Collar for whole home backup.
Remove existing meter socket adapted for installation of Enphase meter collar.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/21/2026 | RESIDENTIAL SOLAR REVISION v.1 | 01/28/2026 | APPROVED |
| 09/24/2025 | RESIDENTIAL SOLAR v.1 | 10/15/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0925-04698
Permit Status: Complete
Permit Description: REV_1, Equipment relocation; 20 kWh Storage addition to existing pv system. 2 Enphase 10C batteries. IQ combiner for PV and Batteries. 200A bus with 200A MCB, interconnection via PCS, Enphase Meter Collar for whole home backup.
Remove existing meter socket adapted for installation of Enphase meter collar.
| Date | Description | Comments |
|---|---|---|
| 10/14/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04698
Permite Description: REV_1, Equipment relocation; 20 kWh Storage addition to existing pv system. 2 Enphase 10C batteries. IQ combiner for PV and Batteries. 200A bus with 200A MCB, interconnection via PCS, Enphase Meter Collar for whole home backup.
Remove existing meter socket adapted for installation of Enphase meter collar.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass. Verbal clearance to TEP DGL. (Enphase meter collar adapter) 12/18/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04698
Permit Description: REV_1, Equipment relocation; 20 kWh Storage addition to existing pv system. 2 Enphase 10C batteries. IQ combiner for PV and Batteries. 200A bus with 200A MCB, interconnection via PCS, Enphase Meter Collar for whole home backup.
Remove existing meter socket adapted for installation of Enphase meter collar.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | BULD - Electrical Clearance | Passed | 02/03/2026 Clearance TEP BAT. Added 2 Enphase batteries to existing PV system, DG meter set. |
|
| 02/03/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 02/03/2026 Clearance TEP BAT. Added 2 Enphase batteries to existing PV system, DG meter set. |