Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | BULD - Electrical Clearance | Passed | 02/03/2026 Clearance TEP BAT. Added 2 Enphase batteries to existing PV system, DG meter set. |
|
| 12/18/2025 | BULD - Electrical Clearance | Partial Pass | Partial pass. Verbal clearance to TEP DGL. (Enphase meter collar adapter) 12/18/2025 |