Permit: TC-RES-0925-04664
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1489 N OHANA PL
Address NEW:
1489 N OHANA PL
Apply Date:
09/22/2025
Applicant:
Noe Quijada
Description:
Adding energy storage (battery) to existing PV solar system; with Tesla Backup Switch.
Permit Reviews
Permit Number - TC-RES-0925-04664
Permit Status: Complete
Permit Description: Adding energy storage (battery) to existing PV solar system; with Tesla Backup Switch.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/23/2025 | RESIDENTIAL SOLAR v.1 | 11/06/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0925-04664
Permit Status: Complete
Permit Description: Adding energy storage (battery) to existing PV solar system; with Tesla Backup Switch.
| Date | Description | Comments |
|---|---|---|
| 10/10/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04664
Permite Description: Adding energy storage (battery) to existing PV solar system; with Tesla Backup Switch.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 11/20/2025 | BULD - Electrical Clearance | N/A | Partial Pass | TEP CLEARANCE: DGL, Tesla backup switch called TEP@ 9:29. |
| 12/22/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Canceled | Canceled per contractor. 12/22/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04664
Permit Description: Adding energy storage (battery) to existing PV solar system; with Tesla Backup Switch.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2026 | BULD - Electrical Clearance | Passed | 01/27/2026 Clearance TEP BAT. Tesla powerwall and disconnect added to existing system. Duplicate. |
|
| 01/27/2026 | COT - RSOL - Electrical Final Solar Project | Passed |