| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2026 | BULD - Electrical Clearance | Passed | 01/27/2026 Clearance TEP BAT. Tesla powerwall and disconnect added to existing system. |
|
| 01/27/2026 | BULD - Electrical Clearance | Passed | 01/27/2026 Clearance TEP BAT. Tesla powerwall and disconnect added to existing system. Duplicate. |
|
| 11/20/2025 | BULD - Electrical Clearance | Partial Pass | TEP CLEARANCE: DGL, Tesla backup switch called TEP@ 9:29. | |
| 12/17/2025 | BULD - Electrical Clearance | Not Ready | ||
| 12/22/2025 | BULD - Electrical Clearance | Canceled | Canceled per contractor. 12/22/2025 | |
| 12/22/2025 | BULD - Electrical Clearance | Canceled | Canceled per contractor. 12/22/2025 |