Permit: TC-RES-0925-04477
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
200 N SIERRA VISTA DR
Address NEW:
200 N SIERRA VISTA DR
Apply Date:
09/10/2025
Applicant:
Chris Wassenberg
Description:
Electrical Service Upgrade and New Service Panel to Allow for Installation of Planned Solar System
Permit Reviews
Permit Number - TC-RES-0925-04477
Permit Status: Complete
Permit Description: Electrical Service Upgrade and New Service Panel to Allow for Installation of Planned Solar System
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/03/2025 | ADMINISTRATIVE v.2 | 11/03/2025 | APPROVED |
| 10/28/2025 | ADMINISTRATIVE v.1 | 10/28/2025 | REQUIRES RESUBMIT |
| 10/17/2025 | RESIDENTIAL ADD/ALT v.2 | 10/28/2025 | APPROVED |
| 09/12/2025 | RESIDENTIAL ADD/ALT v.1 | 10/13/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0925-04477
Permit Status: Complete
Permit Description: Electrical Service Upgrade and New Service Panel to Allow for Installation of Planned Solar System
| Date | Description | Comments |
|---|---|---|
| 09/12/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04477
Permite Description: Electrical Service Upgrade and New Service Panel to Allow for Installation of Planned Solar System
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2025 | BULD - Electrical Clearance | N/A | Not Ready | Missing metal address tag, ground rods and will be trenching for new conductors. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0925-04477
Permit Description: Electrical Service Upgrade and New Service Panel to Allow for Installation of Planned Solar System
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2025 | RSEL - Electrical Progress | Passed | 11/26/26corrections made, clearance INCR, ready for cutover. Trenching proper | |
| 11/26/2025 | BULD - Electrical Clearance | Passed | 11/26/26corrections made, clearance INCR, ready for cutover. Trenching proper | |
| 01/07/2026 | COT - RSEL - Electrical Final | Passed | approved |