Permit: TC-RES-0924-05638
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
865 W MISSOURI ST
Address NEW:
865 W MISSOURI ST
Apply Date:
09/27/2024
Applicant:
Benjamin Grijalva
Description:
Garage
Permit Reviews
Permit Number - TC-RES-0924-05638
Permit Status: Complete
Permit Description: Garage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/30/2024 | RESIDENTIAL NEW DWELLING v.1 | 10/29/2024 | REQUIRES RESUBMIT |
| 01/31/2025 | RESIDENTIAL NEW DWELLING v.2 | 02/18/2025 | REQUIRES RESUBMIT |
| 05/11/2026 | RESIDENTIAL NEW DWELLING v.5 | N/A | REQUIRES RESUBMIT |
| 08/01/2025 | RESIDENTIAL NEW DWELLING v.3 | 09/19/2025 | REQUIRES RESUBMIT |
| 10/08/2025 | RESIDENTIAL NEW DWELLING v.4 | 10/27/2025 | REQUIRES RESUBMIT |
| 05/19/2026 | RESIDENTIAL NEW DWELLING v.6 | 05/20/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0924-05638
Permit Status: Complete
Permit Description: Garage
| Date | Description | Comments |
|---|---|---|
| 01/31/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/05/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0924-05638
Permite Description: Garage
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2026 | RSBU - Building Final | N/A | Re-inspection required | 7-16-26: not ready for Building final. See notes below and intermediate notes for details. Complete installation of light fixtures-see Pima County Light Code for details & replace exterior receptacle with a weather resistant GFCI. Note: all garage receptacles are required to be GFCI. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0924-05638
Permit Description: Garage
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2026 | RSBU - Building Final | Passed | 07/17/2026 All corrections made and verified garage according to plans submitted. |
|
| 07/17/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 07/17/2026 Verified excavated footer at two locations, approved per plan, verified setbacks. |
|
| 07/17/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 07/17/2026 Drywall section spanning lower wall removed. Verified treated sill plate, anchor bolt spacing, stud size and spacing, AWG rough-in. Approved per plan. |
|
| 07/17/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 07/17/2026 Drywall section spanning lower wall removed. Verified treated sill plate, anchor bolt spacing, stud size and spacing, AWG rough-in. Approved per plan. |
|
| 07/17/2026 | COT - RSEL - Electrical Final | Passed | 07/17/2026 GFCI added to circuit breaker serving garage, weather rated receptacle outside. |
|
| 07/17/2026 | COT - RSEL - Electrical Underground | Passed | 07/17/2026 Verified schedule 40 conduit run trench depth of 18". |
|
| 07/17/2026 | COT - RSBU - Preslab | Passed | 07/17/2026 Verified excavated footer at two locations, approved per plan. |
|
| 07/17/2026 | COT - RSBU - Roof Nailing | Passed | 07/17/2026 Drywall section spanning lower wall removed. Verified treated sill plate, anchor bolt spacing, stud size and spacing, AWG rough-in. Verified exposed roof system and nail schedule. Approved per plan. |