Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Roof NailingĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2026 | COT - RSBU - Roof NailingĀ | Re-inspection required | 7-16-26: have a licensed contractor submit a letter to the city documenting that roof installation/nailing was done per the 2018 IRC. | |
| 07/17/2026 | COT - RSBU - Roof NailingĀ | Passed | 07/17/2026 Drywall section spanning lower wall removed. Verified treated sill plate, anchor bolt spacing, stud size and spacing, AWG rough-in. Verified exposed roof system and nail schedule. Approved per plan. |