Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
5447 E WILLARD ST
Apply Date:
09/11/2024
Applicant:
Martha Pliego
Description:
Convert Existing Structure into Sleeping Quarters

Permit Reviews

Permit Number - TC-RES-0924-05281
Permit Status: Inspections
Permit Description: Convert Existing Structure into Sleeping Quarters
Start Date Submittal Complete Date Status  
10/14/2024 RESIDENTIAL NEW DWELLING v.2 11/20/2024 REQUIRES RESUBMIT Review Details
11/26/2024 RESTAMP - RESIDENTIAL v.1 11/26/2024 APPROVED Review Details
09/12/2024 RESIDENTIAL NEW DWELLING v.1 10/14/2024 REQUIRES RESUBMIT Review Details
11/25/2024 RESIDENTIAL NEW DWELLING v.3 11/25/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0924-05281
Permit Status: Inspections
Permit Description: Convert Existing Structure into Sleeping Quarters
Date Description Comments
11/25/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-0924-05281
Permite Description: Convert Existing Structure into Sleeping Quarters
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/03/2026 COT - RSPL - Yard Water Line N/A Re-inspection required Dwv not on test
02/17/2026 COT - RSPL - Rough Soil N/A Re-inspection required Dwv not under te

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0924-05281
Permit Description: Convert Existing Structure into Sleeping Quarters
Total Completed Inspections - 3
Date Description Inspector Results Comments
03/12/2026 COT - RSPL - Rough Soil Passed
03/13/2026 BULD - Electrical Clearance Passed 03/13/2026
Passed from prior inspector on 3/3/2025.
03/13/2026 COT - RSEL - Electrical Underground Passed 03/13/2026
Verified schedule 40 conduit 30ft run from main service panel to ADU in 20" depth trench. Verified schedule 80 conduit pipe to riser. Okay to backfill with shading material.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-24021-SET-11-25-2024-REV2_V3.PDF DOCUMENTS VIEW