Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/27/2023
Applicant:
Perla Vargas
Description:
INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM PV MODULES: (20) SONALI SS-M-440 DC SYSTEM SIZE: 8.8 KW DC INVERTER(S): (1) TESLA POWERWALL+ INVERTER(S) AC SYSTEM SIZE: 7.6 KW AC (7) TESLA MCI-1 OPTIMIZERS (1) TESLA POWERWALL+ BATTERIES

Permit Reviews

Permit Number - TC-RES-0923-08370
Permit Status: Inspections complete
Permit Description: INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM PV MODULES: (20) SONALI SS-M-440 DC SYSTEM SIZE: 8.8 KW DC INVERTER(S): (1) TESLA POWERWALL+ INVERTER(S) AC SYSTEM SIZE: 7.6 KW AC (7) TESLA MCI-1 OPTIMIZERS (1) TESLA POWERWALL+ BATTERIES
Start Date Submittal Complete Date Status  
09/28/2023 RESIDENTIAL SOLAR v.1 10/10/2023 REQUIRES RESUBMIT Review Details
10/12/2023 RESIDENTIAL SOLAR v.2 10/17/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0923-08370
Permite Description: INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM PV MODULES: (20) SONALI SS-M-440 DC SYSTEM SIZE: 8.8 KW DC INVERTER(S): (1) TESLA POWERWALL+ INVERTER(S) AC SYSTEM SIZE: 7.6 KW AC (7) TESLA MCI-1 OPTIMIZERS (1) TESLA POWERWALL+ BATTERIES
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/11/2023 BULD - Electrical Clearance N/A Canceled per voicemail
12/11/2023 RSBU - Building Final N/A Canceled per voicemail
12/11/2023 COT - RSOL - Electrical Final Solar Project N/A Canceled per voicemail

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0923-08370
Permit Description: INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM PV MODULES: (20) SONALI SS-M-440 DC SYSTEM SIZE: 8.8 KW DC INVERTER(S): (1) TESLA POWERWALL+ INVERTER(S) AC SYSTEM SIZE: 7.6 KW AC (7) TESLA MCI-1 OPTIMIZERS (1) TESLA POWERWALL+ BATTERIES
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/10/2024 BULD - Electrical Clearance Passed 1/10/24 DGC/BAT
01/10/2024 RSBU - Building Final Passed 1/10/24 DGC/BAT
01/10/2024 COT - RSOL - Electrical Final Solar Project Passed 1/10/24 DGC/BAT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
23-14968 - ALLISON MOORE-CRUM - PV STRUCTURAL CALCS (V3.9)_V2.PDF DOCUMENTS VIEW
CONS-CONS-CAD PLANS CRUM (1)_V2_V3.PDF DOCUMENTS VIEW