Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building Final
Permit Number - TC-RES-0923-08370
Inspection Description - RSBU - Building Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/10/2024 | RSBU - Building Final | Passed | 1/10/24 DGC/BAT | |
11/30/2023 | RSBU - Building Final | Re-inspection required | 11/30/23 texted at 7:34 am to the tech on the notes Rudy Torres, he said he was off. Called their office at 8:55 am left a voicemail letting them know I needed a tech for the inspection but never heard back. | |
12/04/2023 | RSBU - Building Final | Re-inspection required | 11/30/23 texted at 7:34 am to the tech on the notes Rudy Torres, he said he was off. Called their office at 8:55 am left a voicemail letting them know I needed a tech for the inspection but never heard back. 12/4/23 notified the tech at 6:32 am, notes said tech would be onsite at 8am no response from the tech. |
|
12/11/2023 | RSBU - Building Final | Canceled | per voicemail |