Permit: TC-RES-0923-08347
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2535 E 7TH ST UNIT 2
Address NEW:
2535 E 7TH ST UNIT 2
Apply Date:
09/27/2023
Applicant:
BILL MACKEY
Description:
Second Dwelling
Permit Reviews
Permit Number - TC-RES-0923-08347
Permit Status: Complete
Permit Description: Second Dwelling
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/08/2024 | APPROVED |
| 10/02/2023 | RESIDENTIAL NEW DWELLING v.1 | 10/02/2023 | REQUIRES RESUBMIT |
| 12/19/2023 | RESIDENTIAL NEW DWELLING v.4 | 01/22/2024 | APPROVED |
| 01/22/2024 | RESTAMP - RESIDENTIAL v.1 | 01/23/2024 | APPROVED |
| 12/11/2023 | RESIDENTIAL NEW DWELLING v.3 | 12/19/2023 | REQUIRES RESUBMIT |
| 11/14/2023 | RESIDENTIAL NEW DWELLING v.2 | 12/04/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0923-08347
Permit Status: Complete
Permit Description: Second Dwelling
| Date | Description | Comments |
|---|---|---|
| 11/29/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-08347
Permite Description: Second Dwelling
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | Not ready, nailing at shear not per schedule. Missing anchor bolts at entry way. Stopped inspection. 4/29/2024 |
| 04/29/2024 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
| 09/26/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Garage outlets must be GFCI protected, garbage disposal must be GFCI protected, all outlet covers must be installed |
| 09/26/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Must cut and cap exterior plumbing access points, exterior pvc must be painted |
| 09/26/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | Must cut and cap exterior plumbing access points, exterior pvc must be painted |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-08347
Permit Description: Second Dwelling
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footing is properly dug and cleaned out of debris and loose soil, rebar reinforcement is installed and supported off of ground, and forms are set for monolithic concrete pour of slab and footings. Okay to pour concrete. | |
| 03/06/2024 | COT - RSBU - Preslab | Passed | Footing is properly dug and cleaned out of debris and loose soil, rebar reinforcement is installed and supported off of ground, and forms are set for monolithic concrete pour of slab and footings. Okay to pour concrete. | |
| 05/22/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | OK to cover exterior walls. | |
| 05/22/2024 | COT - RSBU - Roof Nailing | Passed | Ok to dry-in roof system. | |
| 05/29/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/29/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/29/2024 | COT - RSPL - Sewer | Passed | ||
| 05/29/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 07/23/2024 | BULD - Electrical Clearance | Passed | ||
| 07/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | OK to insulate and cover walls. | |
| 07/26/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/26/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 9/26/25 | |
| 09/26/2025 | COT - BULD - SWG Clearance | Passed | Passed SWG CLEARANCE 9/26/25 | |
| 10/15/2025 | COT - RSEL - Electrical Final | Passed | ||
| 10/15/2025 | COT - RSME - Mechanical Final | Passed | ||
| 10/15/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 10/15/2025 | RSBU - Building Final | Passed |