Inspection Status: Partial Pass
Inspection History: COT - RSPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 02/21/2024 |
COT - RSPL - Rough Soil |
|
Partial Pass |
Underground plumbing is under a 10' water test with no leaks. Underground plumbing is not connected to main city sewer line. Not connected to city sewer line. Green tracer wire stops at double clean out. Needs to run all the way to the sewer connection point. Okay to shade piping and backfill trenches under slab. |
| 05/23/2024 |
COT - RSPL - Rough Soil |
|
Not Ready |
|
| 05/29/2024 |
COT - RSPL - Rough Soil |
|
Passed |
|