Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
6780 E 3RD ST
Address NEW:
6780 E 3RD ST
Apply Date:
09/12/2023
Applicant:
Rick D'Alessio
Description:
ADU

Permit Reviews

Permit Number - TC-RES-0923-07946
Permit Status: Issued
Permit Description: ADU
Start Date Submittal Complete Date Status  
09/12/2023 RESIDENTIAL NEW DWELLING v.1 10/06/2023 REQUIRES RESUBMIT Review Details
10/11/2023 RESIDENTIAL NEW DWELLING v.2 10/27/2023 APPROVED Review Details
03/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/20/2024 REQUIRES RESUBMIT Review Details
04/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 04/08/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0923-07946
Permit Status: Issued
Permit Description: ADU
Total Outstanding Activity Conditions - 1
Date Name
01/18/2024 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.

Conditions

Permit Number - TC-RES-0923-07946
Permit Status: Issued
Permit Description: ADU
Date Description Comments
10/16/2023 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
09/12/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/20/2024 MANUAL J - Designs must be submitted and approved prior to Intermediate Inspection. Please submit a Manual J that uses one of the approved software in generating the document. Please touch base with your HVAC supplier/installer, they would have the proprietary software or know of someone who has it. This document should include the Manual J, D, S and Extended Rating Table information.
09/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0923-07946
Permite Description: ADU
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/27/2024 COT - RSEL - Electrical Underground N/A Partial Pass 2/27/24: electrical underground complete. Ground rods need to be installed correctly. E3608.1.4.1 Installation.
The rod and pipe electrodes shall be installed such that at least 8 feet (2438 mm) of length is in contact with the soil. They shall be driven to a depth of not less than 8 feet (2438 mm) except that, where rock bottom is encountered, electrodes shall be driven at an oblique angle not to exceed 45 degrees (0.79 rad) from the vertical or shall be buried in a trench that is at least 30 inches (762 mm) deep. The upper end of the electrodes shall be flush with or below ground level except where the above-ground end and the grounding electrode conductor attachment are protected against physical damage. (250.53(G)]

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0923-07946
Permit Description: ADU
Total Completed Inspections - 16
Date Description Inspector Results Comments
11/29/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
12/20/2023 COT - RSBU - Masonry Pregrout Passed Stem wall CMU block is properly laid, rebar reinforcement is 32" on center within the block cells. Okay to proceed with grout.
12/20/2023 COT - RSPL - Rough Soil Passed Underground plumbing is connected to main sewer line and under a water test with no leaks. Okay to shade pipe, backfill trench, and proceed with compaction of sub-soil for slab on grade.
12/20/2023 COT - RSPL - Sewer Passed Underground plumbing is connected to main sewer line and under a water test with no leaks. Okay to shade pipe, backfill trench, and proceed with compaction of sub-soil for slab on grade.
01/11/2024 COT - RSBU - Preslab Passed
02/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/21/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
02/21/2024 COT - RSBU - Roof Nailing Passed
03/01/2024 BULD - Electrical Clearance Passed Conduit is ran from panel to transformer underground. Ground rod is properly installed and ground wire connected from ground bus bar to ground rod. ECO Clearance issued for TEP to energize system.
03/01/2024 COT - RSEL - Electrical Underground Passed 3/1/24: Grounding rod has been driven to below grade. Okay to issue electrical clearance.
03/01/2024 COT - RSEL - Grounding/Bonding Passed 3/1/24: Grounding rod has been driven to below grade. Okay to issue electrical clearance.
03/01/2024 COT - RSPL - Yard Water Line Passed Water line is connected to the meter and a blue tracer wire is attached from meter to exterior hose bib. Okay to shade pipe and backfill trench.
06/03/2024 RSBU - Building Final Passed
06/03/2024 COT - RSEL - Electrical Final Passed
06/03/2024 COT - RSME - Mechanical Final Passed
06/03/2024 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
REVISED AFFADAVIT_V2.PDF DOCUMENTS VIEW
DALESSIO (HLHG)_V2.PDF DOCUMENTS VIEW
2ND REVISED OWNER BUILDER AFFADAVIT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-COMPLETE PLANS WITH CORRECTIONS_V2_V3.PDF DOCUMENTS VIEW