Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2024 | COT - RSEL - Electrical Underground | Partial Pass | 2/27/24: electrical underground complete. Ground rods need to be installed correctly. E3608.1.4.1 Installation. The rod and pipe electrodes shall be installed such that at least 8 feet (2438 mm) of length is in contact with the soil. They shall be driven to a depth of not less than 8 feet (2438 mm) except that, where rock bottom is encountered, electrodes shall be driven at an oblique angle not to exceed 45 degrees (0.79 rad) from the vertical or shall be buried in a trench that is at least 30 inches (762 mm) deep. The upper end of the electrodes shall be flush with or below ground level except where the above-ground end and the grounding electrode conductor attachment are protected against physical damage. (250.53(G)] |
|
| 03/01/2024 | COT - RSEL - Electrical Underground | Passed | 3/1/24: Grounding rod has been driven to below grade. Okay to issue electrical clearance. |