Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0923-07920
Permit Details
Apply Date:
09/11/2023
Applicant:
TFS Solar
Description:
Roof mount 6.02 kW DC photovoltaic solar system; 14 AC modules, 2 branches, PV subpanel, 30A PV breaker on 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-0923-07920
Permit Status: Inspections complete
Permit Description: Roof mount 6.02 kW DC photovoltaic solar system; 14 AC modules, 2 branches, PV subpanel, 30A PV breaker on 200A bus with 200A MCB
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/06/2023 | RESIDENTIAL SOLAR v.2 | 12/12/2023 | APPROVED |
09/11/2023 | RESIDENTIAL SOLAR v.1 | 10/04/2023 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0923-07920
Permit Description: Roof mount 6.02 kW DC photovoltaic solar system; 14 AC modules, 2 branches, PV subpanel, 30A PV breaker on 200A bus with 200A MCB
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/11/2024 | RSBU - Building Final | Passed | ||
01/11/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
01/11/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |