Permit: TC-RES-0923-07902
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
320 N SCHRADER LN
Address NEW:
320 N SCHRADER LN
Apply Date:
09/10/2023
Applicant:
Fernando Hinojosa
Description:
Rear porch replacement and new attached garage.
Permit Reviews
Permit Number - TC-RES-0923-07902
Permit Status: Complete
Permit Description: Rear porch replacement and new attached garage.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/25/2023 | RESIDENTIAL NEW DWELLING v.2 | 11/21/2023 | REQUIRES RESUBMIT |
| 09/11/2023 | RESIDENTIAL NEW DWELLING v.1 | 09/27/2023 | REQUIRES RESUBMIT |
| 11/28/2023 | RESIDENTIAL NEW DWELLING v.3 | 12/07/2023 | REQUIRES RESUBMIT |
| 01/08/2024 | RESIDENTIAL NEW DWELLING v.4 | 01/10/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-07902
Permite Description: Rear porch replacement and new attached garage.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2024 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | Not required by the plans. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0923-07902
Permit Description: Rear porch replacement and new attached garage.
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2024 | COT - RSBU - Preslab | Passed | ||
| 03/15/2024 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
| 03/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/05/2024 | COT - RSBU - Masonry Pregrout | Passed | all work per approved plans. | |
| 04/23/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/23/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 05/06/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | New fire rated door is installed to house from garage with self closing hinges. Okay to proceed. | |
| 05/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Rough in of electrical outlets and lights for garage is complete. Okay to proceed with trim out of electrical boxes and outlets. | |
| 05/17/2024 | RSBU - Building Final | Passed | Garage addition is complete, electrical outlets are GFCI protected, garage doors are installed and photo sensors installed and operational, door from garage to house is fire rated and self closing, and exterior lights are installed and operational. Okay to issue Certificate of Completion. | |
| 05/17/2024 | COT - RSEL - Electrical Final | Passed | Electrical panel is properly labeled, all garage receptacles are protected by a GFCI breaker in the panel, and garage door opener is installed and operational with proper photo sensor lights installed. Okay to issue Certificate of Completion for this permit. | |
| 05/17/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed per plans and is operational. |