Permit: TC-RES-0826-04457
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
10999 E WHITE SAGE DR
Address NEW:
10999 E WHITE SAGE DR
Apply Date:
08/11/2026
Applicant:
Adrienne Strom
Description:
REV_1, Electrical plans Revised; Deguzman Residence - 10.68kW DC Photovoltaic Roof Mount System with SolarEdge Nexis Battery Backup
Permit Reviews
Permit Number - TC-RES-0826-04457
Permit Status: Complete
Permit Description: REV_1, Electrical plans Revised;
Deguzman Residence - 10.68kW DC Photovoltaic Roof Mount System with SolarEdge Nexis Battery Backup
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/12/2026 | RESIDENTIAL SOLAR v.1 | 08/28/2026 | APPROVED |
| 10/19/2026 | RESIDENTIAL SOLAR REVISION v.1 | 10/28/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0826-04457
Permit Status: Complete
Permit Description: REV_1, Electrical plans Revised;
Deguzman Residence - 10.68kW DC Photovoltaic Roof Mount System with SolarEdge Nexis Battery Backup
| Date | Description | Comments |
|---|---|---|
| 08/28/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0826-04457
Permit Description: REV_1, Electrical plans Revised;
Deguzman Residence - 10.68kW DC Photovoltaic Roof Mount System with SolarEdge Nexis Battery Backup
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2026 | RSBU - Building Final | Passed | 11-06-26 installed per plan, bat revised and approved. | |
| 11/06/2026 | COT - RSEL - Grounding/Bonding | Passed | 11-06-26 approved per plan | |
| 11/06/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 11-06-26 installed per plan, bat revised and approved. | |
| 11/18/2026 | BULD - Electrical Clearance | Passed | 11-18-26 Inspection was called in on 11-06-26 for electrical clearance. DGL given on 10-01-26. Revision of plans for number of strings in battery. The clearance for 11-06-26 should have been for DGC/BAT. TEP has already been contacted on 11-17-26 for correction with Jennifer TEP representative. |