Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 10/01/2026 |
BULD - Electrical Clearance |
|
Partial Pass |
Partial pass. Verbal clearance to TEP DGL. (MSA) 10/1/2026 |
| 10/13/2026 |
BULD - Electrical Clearance |
|
Partial Pass |
10-13-26 partial pass pending require a revision of plans. On current plans three strings to PV showing, during inspection There was only two strings to PV. |
| 11/06/2026 |
BULD - Electrical Clearance |
|
Passed |
11-06-26 Electrical plans Revised,battery approved as plan. |
| 11/18/2026 |
BULD - Electrical Clearance |
|
Passed |
11-18-26 Inspection was called in on 11-06-26 for electrical clearance. DGL given on 10-01-26. Revision of plans for number of strings in battery. The clearance for 11-06-26 should have been for DGC/BAT. TEP has already been contacted on 11-17-26 for correction with Jennifer TEP representative. |