Permit: TC-RES-0824-05056
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
617 S JANET AV
Address NEW:
617 S JANET AV
Apply Date:
08/30/2024
Applicant:
cinthya juarez
Description:
Rebuild SFR see TC-DMO-0523-00105
Permit Reviews
Permit Number - TC-RES-0824-05056
Permit Status: Complete
Permit Description: Rebuild SFR see TC-DMO-0523-00105
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/19/2024 | RESIDENTIAL NEW DWELLING v.1 | 10/21/2024 | REQUIRES RESUBMIT |
| 08/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/27/2025 | APPROVED |
| 10/24/2024 | RESIDENTIAL NEW DWELLING v.2 | 12/04/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0824-05056
Permit Status: Complete
Permit Description: Rebuild SFR see TC-DMO-0523-00105
| Date | Description | Comments |
|---|---|---|
| 11/05/2024 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 12/04/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/17/2025 | Impact fees must be paid in full prior to issuance of CoO/LOC | |
| 09/26/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0824-05056
Permite Description: Rebuild SFR see TC-DMO-0523-00105
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 08/21/2025 | RSBU - Building Final | N/A | Partial Pass | 8.21.2025 Partial-pass pending accessible route to entrance to meet City of Tucson Inclusive Home Design requirements. Roof receptacle needs to be weather-resistant, pvc needs paint at AC, thermostat cannot exceed 48" from floor, and need address number at front of home. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0824-05056
Permit Description: Rebuild SFR see TC-DMO-0523-00105
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2025 | COT - RSPL - Sewer | Passed | 2-26-25, sewer connection,underground plumbing verified as per approved plans. Okay to backfill. | |
| 03/03/2025 | COT - RSBU - Preslab | Passed | ||
| 03/03/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/10/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/10/2025 | COT - RSBU - Roof Nailing | Passed | Ok to dry-in roof system | |
| 06/06/2025 | BULD - Electrical Clearance | Passed | 6/6/25 TEP CLEARANCE: ECO |
|
| 06/12/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 6/12/25 ok to insulate and cover | |
| 08/21/2025 | COT - RSPL - Rough Soil | Passed | Duplicate inspection. 8/21/2025 | |
| 08/21/2025 | COT - RSPL - Yard Water Line | Passed | Duplicate inspection. 8/21/2025 | |
| 08/21/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/21/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/22/2025 | COT - RSME - Mechanical Final | Passed | ||
| 08/22/2025 | RSBU - Building Final | Passed | ||
| 08/22/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 08/22/2025 | COT - RSEL - Electrical Final | Passed | ||
| 08/22/2025 | ENGR Engineering Final | Passed |