Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/21/2025 |
ENGR Engineering Final
|
|
Not Ready |
Accessible Route to door from driveway not provided. Route needs to be built. Also threshold at accessible door is max. 1/2” vertical. |
| 08/22/2025 |
ENGR Engineering Final
|
|
Passed |
|