Permit: TC-RES-0824-04982
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
1519 N CLOVERLAND AV
Address NEW:
1519 N CLOVERLAND AV
Apply Date:
08/27/2024
Applicant:
Blueprint Home Services
Description:
Rooftop solar installation, and MPU.
Permit Reviews
Permit Number - TC-RES-0824-04982
Permit Status: Issued
Permit Description: Rooftop solar installation, and MPU.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/02/2024 | RESIDENTIAL SOLAR REVISION v.2 | 12/17/2024 | APPROVED |
| 11/19/2024 | RESIDENTIAL SOLAR REVISION v.1 | 11/19/2024 | REQUIRES RESUBMIT |
| 08/27/2024 | RESIDENTIAL SOLAR v.1 | 09/26/2024 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0824-04982
Permite Description: Rooftop solar installation, and MPU.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2024 | RSBU - Building Final | N/A | Not Ready | 11/19/24 Revised set of plans needed as disconnect and breaker are different sizes, tech had plans from September but city only has August plans. Panel placement and bonding correct, just need revised plans for breaker and disconnect |
| 11/19/2024 | COT - RSOL - Electrical Final Solar Project | N/A | Not Ready | Revised set of plans needed as disconnect and breaker are different sizes, tech had plans from September but city only has August plans. Panel placement and bonding correct, just need revised plans for breaker and disconnect |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0824-04982
Permit Description: Rooftop solar installation, and MPU.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2024 | BULD - Electrical Clearance | Passed | Passed INCR, called Marcia 12:39 to restore power Partial pass pending solar 12/4/24 TEP clearance for DGC. Corrections were made. |