Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
08/22/2024
Applicant:
Hailey McGaw
Description:
RESIDENTIAL INSTALLATION OF 6 NEW SILFAB; SIL-400 HC+ MODULES ON AN EXSITING RESIDENTIAL SOLAR SYSTEM. NEW AND EXISTING COMBINED SYSTEM SIZE OF 11.78 kW DC / 7.6 kW AC - ALL MODULES ARE TO BE INSTALLED ON EXISTING INVERTER SE7600H-US

Permit Reviews

Permit Number - TC-RES-0824-04918
Permit Status: Complete
Permit Description: RESIDENTIAL INSTALLATION OF 6 NEW SILFAB; SIL-400 HC+ MODULES ON AN EXSITING RESIDENTIAL SOLAR SYSTEM. NEW AND EXISTING COMBINED SYSTEM SIZE OF 11.78 kW DC / 7.6 kW AC - ALL MODULES ARE TO BE INSTALLED ON EXISTING INVERTER SE7600H-US
Start Date Submittal Complete Date Status  
10/01/2024 RESIDENTIAL SOLAR v.2 10/29/2024 APPROVED Review Details
08/26/2024 RESIDENTIAL SOLAR v.1 09/25/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0824-04918
Permit Status: Complete
Permit Description: RESIDENTIAL INSTALLATION OF 6 NEW SILFAB; SIL-400 HC+ MODULES ON AN EXSITING RESIDENTIAL SOLAR SYSTEM. NEW AND EXISTING COMBINED SYSTEM SIZE OF 11.78 kW DC / 7.6 kW AC - ALL MODULES ARE TO BE INSTALLED ON EXISTING INVERTER SE7600H-US
Date Description Comments
10/30/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0824-04918
Permit Description: RESIDENTIAL INSTALLATION OF 6 NEW SILFAB; SIL-400 HC+ MODULES ON AN EXSITING RESIDENTIAL SOLAR SYSTEM. NEW AND EXISTING COMBINED SYSTEM SIZE OF 11.78 kW DC / 7.6 kW AC - ALL MODULES ARE TO BE INSTALLED ON EXISTING INVERTER SE7600H-US
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/02/2025 RSBU - Building Final Passed
01/02/2025 COT - RSOL - Electrical Final Solar Project Passed
01/02/2025 BULD - Electrical Clearance Passed Approved - DGC Clearance to TEP is required for the solar meter