Permit: TC-RES-0824-04868
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
7353 E PLACITA DEL ANIMO
Apply Date:
08/21/2024
Applicant:
TFS Solar
Description:
roof mount 11.07kW DC photovoltaic solar system; 27 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-0824-04868
Permit Status: Inspections complete
Permit Description: roof mount 11.07kW DC photovoltaic solar system; 27 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 200A bus with 200A MCB
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/23/2024 | RESIDENTIAL SOLAR v.1 | 09/23/2024 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0824-04868
Permite Description: roof mount 11.07kW DC photovoltaic solar system; 27 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 200A bus with 200A MCB
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/03/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass for DGL clearance from MSA installation. Called clearance to TEP at 11. CLEAR DGL |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0824-04868
Permit Description: roof mount 11.07kW DC photovoltaic solar system; 27 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 200A bus with 200A MCB
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/19/2024 | RSBU - Building Final | Passed | ||
11/19/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
11/19/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the Solar meter |