Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0824-04868
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7353 E PLACITA DEL ANIMO
Address NEW:
7353 E PLACITA DEL ANIMO
Apply Date:
08/21/2024
Applicant:
TFS Solar
Description:
roof mount 11.07kW DC photovoltaic solar system; 27 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-0824-04868
Permit Status: Complete
Permit Description: roof mount 11.07kW DC photovoltaic solar system; 27 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/23/2024 | RESIDENTIAL SOLAR v.1 | 09/23/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0824-04868
Permite Description: roof mount 11.07kW DC photovoltaic solar system; 27 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 200A bus with 200A MCB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass for DGL clearance from MSA installation. Called clearance to TEP at 11. CLEAR DGL |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0824-04868
Permit Description: roof mount 11.07kW DC photovoltaic solar system; 27 modules and microinverters, 3 branches, PV combiner box, interconnection via meter socket adapter to 200A bus with 200A MCB
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2024 | RSBU - Building Final | Passed | ||
| 11/19/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 11/19/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the Solar meter |